stahl-leichtbauweise-gesamtleistung-klinik-lengg-4stahl-leichtbauweise-gesamtleistung-klinik-lengg-3stahl-leichtbauweise-gesamtleistung-klinik-lengg-1

Extension 1. stage Clinic Lengg

The first step was realized as a 2-floored extension on the existing building.

ERNE Holzbau AG created these new stations during continuous operation, including the needed efficiency-boosting measures, in just 14 months of construction.

The innovative panel construction combined with a wood/lightweight-steel framing, allows to fulfill the high requirement of lightness and speed, as well as sound insulation and fire protection.

Documentation: Clinic Lengg in German

Link to the movie about the project.

Photos: Erne Holzbau AG

 

 

 

 

 

 

Cocoon System AG

St. Johanns-Vorstadt 80
CH-4056 Basel

Telefon +41 61 260 11 60
Fax +41 61 260 11 63

info@cocoon.ch